projects
social
QR

Case Study | Cuyahoga County Public Library Building Assessment

Tec performed a comprehensive mechanical and electrical building assessment for the Cuyahoga County Public Library. The assessment was conducted at 29 branches including the library administrative offices. The survey included the evaluation of the existing heating, ventilating, electrical, lighting, fire alarm and fire protection system at each location. Field investigations were conducted at each location and a detailed report was prepared outlining the existing building system deficiencies, allowing the library system to rank the building needs and determine a construction improvement schedule.

This assessment has helped to set the priorities for future construction projects for the library system. Tec is involved in the design for two new branch libraries and renovations at two existing branches brought forth by this report.